Help Center
Home
Get started
  • Construction

    • Project Financials
    • Retainage
    • Timeline
    • Certified Documents
  • Subcontracts
  • Storage

    • File Storage
    • Project Storage
  • Connect

    • Connect (web)
    • Connect Mobile
  • Foundation

    • Portal
    • Code Library
    • Construction (meta-package)
  • AI
  • Help
FullClarity
Home
Get started
  • Construction

    • Project Financials
    • Retainage
    • Timeline
    • Certified Documents
  • Subcontracts
  • Storage

    • File Storage
    • Project Storage
  • Connect

    • Connect (web)
    • Connect Mobile
  • Foundation

    • Portal
    • Code Library
    • Construction (meta-package)
  • AI
  • Help
FullClarity
  • Overview
  • Quick start
  • Install & configure
  • How to

    • Creating a project
    • Customise terminology (rename records)
      • Estimate columns
      • Budget columns
      • Forecast columns
      • Revenue recognition columns
    • Managing cost centres
    • Estimating

      • Creating an estimate
      • Adding lines to an estimate
      • Importing an estimate from a spreadsheet
      • Creating purchase orders from the estimate
  • Contracts & billing

    • Contracts & billing
    • Set up billing schedules
    • Issue a progress claim
    • Create a variation
  • Revenue recognition

    • Revenue recognition
    • Set up revrec rules
    • Run a monthly batch
    • Adjust a revrec entry
    • Capital project revrec
  • Reference

    • Reference
    • Configuration record fields
    • Permissions
    • Custom records
    • Column glossary

Column glossary

Every Project Financials worksheet — Estimate, Budget, Forecast, Revenue Recognition — shows a set of columns with named labels. This page explains what each one means and (where applicable) how it's calculated.

To rename or hide any of these columns on your worksheets, see Customise terminology.

  • Estimate columns
    • Always-available columns
    • Optional columns (when Enable Freight, Sales Tax, and Escalation is on)
  • Budget columns
  • Forecast columns
  • Revenue Recognition columns
  • Related

Estimate columns

These columns appear on the Estimate worksheet. Where calculated, the formula is shown in the right-hand column. Some columns are hidden by default — see Customise terminology → Estimate columns.

Always-available columns

ColumnWhat it showsCalculation
IndexAuto-generated row number—
Line RefInternal ID of the estimate line—
CategoryCost category from the project's cost centreUser-entered
StageBilling or project stage for the line (Stage billing)User-entered
Cost TypeSecondary classification (e.g. Materials, Labour)User-entered
Allowance TypeStandard / Prime Cost / Provisional SumUser-entered
Item NameNetSuite itemUser-entered
DescriptionLine description (defaults from item)User-entered
UnitUnit of measure (defaults from item)User-entered
QuantityQuantity being costedUser-entered
RateUnit cost (defaults from item)User-entered
AmtBase cost amountQuantity × Rate
Contingency %Risk buffer percentage (bidirectional with Contingency $)User-entered
Contingency $Risk buffer dollar amount (bidirectional with Contingency %)Subtotal × Contingency %
Cost $Total cost to the builder before marginAmt + freight + tax + contingency + escalation
Margin %Margin as a percentage of selling price (bidirectional with Margin $)User-entered
Margin $Margin dollar amount (bidirectional with Margin %)Cost $ × Margin % ÷ (1 − Margin %)
Net $Selling price excluding output taxCost $ + Margin $
WP LocationWork-package location (a physical area on site)User-entered
AppliedWhether the line is included in totalsUser-toggle
NotesFree-text notesUser-entered
QuoteLink to a FullClarity Quote recordSystem-populated
SupplierLinked vendorUser or system
Purchase OrderLink to a NetSuite PO raised against this lineSystem-populated
Gross AmtGross amount; equals Net $ in US subsidiariesSystem-calculated

Optional columns (when Enable Freight, Sales Tax, and Escalation is on)

ColumnWhat it showsCalculation
Freight %Freight as a % of AmtUser-entered
Freight $Freight dollar amountAmt × Freight %
Sales Tax %Input sales tax rate applied to (Amt + Freight $)User-entered
Sales Tax $Input sales tax dollar amount(Amt + Freight $) × Sales Tax %
SubtotalPre-contingency subtotalAmt + Freight $ + Sales Tax $
Subtotal w/ ContingencySubtotal plus contingencySubtotal + Contingency $
Escalation %Price escalation allowance for inflationUser-entered
Escalation $Escalation dollar amountSubtotal w/ Contingency × Escalation %
Total Other CostsSum of additional costs above the base AmtFreight + Sales Tax + Contingency + Escalation

Margin vs markup

Margin is calculated as a percentage of the selling price, not as a markup on cost. A 25% margin on a $100 cost yields a $33.33 margin and a $133.33 net (not $125). Bidirectional entry applies to Freight %/$, Contingency %/$, Escalation %/$, and Margin %/$ — entering either value calculates the other.

Budget columns

The Budget worksheet shares most columns with Estimate but adds budget-vs-actual tracking. All columns are renameable and hideable — see Customise terminology → Budget columns for the full list.

ColumnWhat it shows
Actuals to DateTotal spent against the line so far
Adjusted % CompleteManually adjusted % complete used for forecasting (overrides the calculated value)
Adjusted % OverrideToggle indicating the % complete is being manually overridden
Allowance Type, Category, Stage, Cost Type, Item Name, Description, Unit, Quantity, Rate, Amt, Contingency, Margin, Net $Same meaning as on the Estimate worksheet
AppliedWhether the line is included in totals
Asset TypeAsset classification (capital projects)
CommitmentsCommitted cost on the line (POs and vendor bills against this line)
Estimated % CompleteSystem-calculated % complete from actuals against budget
Forecast Over / (Under) BudgetVariance between forecasted final cost and budgeted cost
Forecasted Remaining CostsProjected cost to complete the line
Fund TypeFund type allocation (multi-fund projects)
Gross AmountGross amount; equals Net $ in US subsidiaries
Line RefInternal line ID
NotesFree-text notes
Previous % Complete% complete at the previous forecast snapshot
Sales Estimate ValueThe originating estimate's net value for the line
Sales Tax %, Sales Tax $, Freight %, Freight $, Escalation %, Escalation $Same meaning as on the Estimate worksheet

Forecast columns

The Forecast worksheet rolls actual cost and committed cost into projected cost-to-complete, with a forecast rate per line. See Customise terminology → Forecast columns for the full renameable list.

ColumnWhat it shows
Actuals to DateTotal spent against the line
Adjusted % Complete, Adjusted % Override, Estimated % Complete, Previous % CompleteSame meaning as on Budget
Commitments / Total Committed CostsCommitted cost on the line (POs, vendor bills, contracts)
Forecast Over / (Under) BudgetVariance between forecasted final cost and budget
Forecasted Remaining CostsProjected cost to complete
Total Cost To CompleteCost still to be incurred for the line
Project Budget Total CostBudgeted total cost for the line
Rate (renamed Forecast Rate)Per-unit rate used for the forecast
Tax, Tax Code, Tax RateTax breakdown for the line
Supplier, WP Location, Allowance Type, Category, Cost Type, Item Name, Description, Unit, Quantity, NotesSame meaning as on the Estimate worksheet
Sales Tax %, Sales Tax $, Freight %, Freight $, Escalation %, Escalation $, Margin %, Margin $, Net $, Contingency %, Contingency $, Amt, Cost $, Gross AmountSame meaning as on the Estimate worksheet

Revenue Recognition columns

The Revenue Recognition worksheet shows one row per project per recognition round. Calculated columns show what the system proposes; revised columns let you override before posting.

ColumnWhat it showsCalculation
Job #NetSuite Job number—
Job NameProject name—
Job StatusStatus of the project (Active / Complete / Closed)—
SubsidiaryProject's subsidiary—
Class / Department / LocationStandard NetSuite segments—
Total ContractTotal contract value on the projectFrom the contract
Budgeted CostsEstimate / budget total costFrom the budget
Project Budgeted CostsProject-rolled budget totalFrom the project
Actual CostsActual cost to dateYTD actuals
Invoiced to DateTotal invoiced against the projectYTD invoiced
Previously Recognised %Cumulative % recognised in prior periodsFrom prior recognition rounds
Previously Recognised Rev $Cumulative revenue recognised in prior periodsFrom prior recognition rounds
Previously Recognised Cost $Cumulative cost recognised in prior periodsFrom prior recognition rounds
Calculated % CompleteSystem-calculated % completemin(Actual Costs / Budgeted Costs, 100%); forced to 100% if project is complete
Calculated Rev $ to RecogniseSystem-proposed revenue for this periodSee the section overview for the two basis options
Calculated Cost $ to RecogniseSystem-proposed cost for this periodDepends on Advanced Forecasting setting
Calculated Total Rev $ Recognised This PeriodPer-line total revenue across cost categoriesSum of segmented amounts
Calculated Total Cost $ Recognised This PeriodPer-line total cost across cost categoriesSum of segmented amounts
Revised % CompleteManual override of the % completeUser-entered
Revised Rev $Manual override of the revenue amountUser-entered
Revised Cost $Manual override of the cost amountUser-entered
Total Rev $ To RecogniseFinal revenue this period after overridesRevised value (or Calculated if no override)
Total Cost $ To RecogniseFinal cost this period after overridesRevised value (or Calculated if no override)
SnapshotThe historical project snapshot used for the calculationSystem-populated
Snapshot DateDate of the snapshotSystem-populated
JournalLink to the posted Revenue Recognition transactionPopulated after the batch posts

Related

  • Customise terminology — rename or hide columns on each worksheet
  • Custom records
  • Run a monthly batch